Site 1 (242 Broome Street)

 

Site 1 will be installing sewer connections until Thursday, April 21st. Excavation on Ludlow Street will occur to allow for the utility connection and will require a diversion of the pedestrian walkway. Flag persons will be placed on both ends of the walkway to direct pedestrians to the other side of the street. The 40" wide trench from the foundation wall to the middle of Ludlow will be steel plated during after work hours for protection. A pedestrian walkway will be set up daily for after work hours.  No after-hours work is anticipated. 

 

Site 2 (115 Delancey Street)

 

Site 2 will continue at the cellar level with installation of pile caps, waterproofing, and structural slab installation.  Both of these activities will continue on Saturday, April 23rd between the hours of 9am-5pm.  After-hours work may occur on Wednesday, April 20th through Friday, April 22nd depending on the size of concrete pours scheduled for those days.

 

Site 5 (145 Clinton Street)

 

Foundation and superstructure work continues at Site 5. Underslab plumbing and electrical installations continue along with concrete pours. Concrete pours are anticipated to take place on Monday, April 18th and Wednesday, April 20th in the early morning hours.      

  

Site 6 (175 Delancey Street)

 

The coming week's activity at Site 6 includes erecting forms, installing rebar, and pouring concrete for the west half of the 2nd floor slab. A pour on the west side of the 2nd floor is anticipated to take place on Wednesday, April 20th. Due to the size of the concrete pour next week, some finishing work may occur in the evening. Work is scheduled for Saturday,  April 23rd from 9am to 5pm. 

 

Suffolk Street work (between Delancey and Broome)

 

Drill work is now anticipated to take place Wednesday, April 20th - Friday, April 22nd at various locations on Suffolk Street and the east and west sidewalks between Delancey and Broome Streets. Borings for soil testing will be drilled on the sidewalk with sufficient clearance to safely allow pedestrian traffic to pass.  Cones and plastic bollards, as needed, will be used to divert traffic away from the sidewalk during the work.   

 

 

Construction Job Info Session - Wednesday, May 18th, 4-6pm

Grand Street Settlement, 80 Pitt Street

Delancey Street Associates, along with Community Board 3, and workforce partners the Lower East Side Employment Network (LESEN), Workforce1, and Building Skills will host an info session about constructions jobs at Essex Crossing.  Learn about upcoming positions and job skills training and programs.

 

 

M/WBE Opportunities

Delancey Street Associates encourages Minority and Women Owned Business Enterprise (M/WBE) contractors to participate in the development of Essex Crossing across multiple trades. For more information about upcoming bid opportunities, as well as information about future M/WBE trade fairs, networking events and workshops related to the project, please fill out an inquiry form on our website.

 

 

You can visit the Essex Crossing News section for the latest project updates.

 

Delancey Street Associates, 419 Park Ave South, New York, NY 10016

 

 

Sent by info@essexcrossingnyc.com in collaboration with

 

No comments:

Post a Comment